Posting dated: February 28, 2006
·
A VGT employee requested a 24 hour notice before
gas is flowed at the St. Vincent interconnect, due to inactivity of the point
and the point should be considered to be an emergency only
exchange point.
·
Due to the size of the St. Vincent meter the
flow should be restricted to a minimum of 80,000
mcf/d
rate.
·
VGT technicians are coordinating with Great Lake
technician to update equipment at the St. Vincent interconnect.
· The St. Vincent interconnect is available to flow gas. Volumes will be available from Great Lakes Pipeline.